The folks arrived to pour the concrete over the top of the "in floor" heat piping and also in the garage and utility room.
At the same time Joel, our excavator operator worked for two days on the lot moving getting rid of stumps and moving dirt. The lot now looks totally different and much bigger.
No comments:
Post a Comment